MV Ibis Arrow Phase 2
Installation of the second phase with 6 Cargo modules was executed along side in São Sebastião, Brazil...
Leia mais
|
|
|
|
|
|
MV Ibis Arrow
Installation of 4 Cargo modules was executed along side in São Sebastião, Brazil...
Leia mais
|
|
|
|
|
|
MV Harefield installation
Installation of 6 Cargo modules was executed along side in Santos, Brazil...
Leia mais
|
|
|
|
|
|
MV Cormorant Arrow installation
Re-installation of 2 Cargo modules from one ship to another, this work was executed along side Brazil...
Leia mais
|
|
|
|
|
|
MV Toki Arrow installation
Refitting and installation of 12 Cargo modules in Antwerp...
Leia mais
|
|
|
|
|
|
Drumfiller Australia
Trilobes has delivered a drum filling line as part of the extension of the Australia juice terminal in Newcastle...
Leia mais
|
|
|
|