2019 Mexico; design, engineering, delivery and commissioning of a complete process system for a turnkey aseptic tank farm for NFC juices.
2019 China; consultancy, engineering and technical support for the de-commissioning and reinstallation of a cargo system for both NFC and FCOJ, from three juice carriers into two new juice carriers.
2019 Engineering and design for the de-commissioning and reinstallation of a cargo system for both NFC and FCOJ.
2018 China; conversion management of a cargo vessel into a juice carrier, including coordination, project management, process-, automation- and electrical engineering, supervision and commissioning on site.
2018 The Netherlands; design, construction, turn-key installation and commissioning of the process- and electrical system of an NFC juice storage facility.
2017 Design, construction, turn-key installation and commissioning of the process- and electrical system of a liquid ferry for shortsea transport of juice /dairy products.
2016 Several consultancy studies in relation to optimization of juice terminals.
2016 Belgium; removal and re-installation of cargo tank system from an existing juice carrier into a new juice carrier.
2015 Egypt; consultancy, commissioning and technical assistance for starting up a Juice plant.
2015 Disassembly of cargo tanks from a juice carrier.
2015 On board of a juice carrier, replacement of NFC piping-, supply new nitrogen system and several modification works 
2014 On board of a juice carrier, engineering, design, construction and turnkey installation of new NFC piping, CIP-, nitrogen- and air compressor system
2014 On board of a juice carrier, engineering, design, construction and turnkey installation of a new air compressor system, modification deckhouse etc.
2013 Disassembly of cargo tanks from a juice carrier and install on quay side. 
2013 Expansion of cargo capacity on a juice carrier by means of extra tank containers, including engineering, design, construction, turnkey installation and commissioning of the process- and electrical system
2012 Germany, On board of a juice carrier, engineering, design, construction and installation of 5 cargo tanks for both NFC and FCOJ.
2011 Belgium, Juice terminal expansion with special product handling system, expansion of drumstore capacity and new refrigeration plant based (due to facing out of Freon R22) modular based ammonia system with secondary cooling fluid.
2010 Belgium, expansion of the NFC Terminal with several process lines, including engineering, installation and automation.
2009 On board of a juice carrier, engineering, design, construction and installation of cargo tanks for both NFC and FCOJ, at our construction site in Brazil.
2008 On board of a juice carrier ), engineering, design, construction and installation of 6 cargo tanks for FCOJ, including tank and process engineering, purchasing, installation and developing our own automation system.
2008 Engineering and installation of an additional NFC process system making it an aseptic juice carrier, during her stay at a yard in Singapore.
2007 Belgium; reconstruction of ship cargo system, new cooling plant and updating automation.
2007 Brazil; Study Juice supply chain regarding vessels, storage and production capacity. This as a blue print for later executed projects.
2006 Australia; expansion of Juice terminal with drum filling equipment.
2006 Brasil; re-installation of cargo modules and system between two vessels.
2006 China; study Apple Juice Concentrate supply chain.
2005 Antwerp; expansion of Juice terminal with process equipment