Trilobes has a track record in delivering high quality projects on time and all over the world, from Santos to Tokyo, and Rotterdam to Australia.

World map with some of our project locations:

Map of the World with project locations

 

Trilobes projects over the last years:

2023 Portugal, conversion management of a cargo vessel into a juice vessel, including coordination, project management, process, automation and electrical engineering, supervision and commissioning on site.
2022 Belgium/UK, design, construction, turn-key installation and commissioning of a storage, process and nitrogen generator system for a vessel for shortsea transport of juices.
2022 Belgium, design, construction, installation and commissioning of existing storage modules and a process and electrical system for an oil storage facility.
2021 The Netherlands, design, construction, turn-key installation and commissioning of the storage, process- and electrical system of an aseptic NFC juice storage facility.
2020 USA, consultancy, process design, technical review and commissioning of an aseptic process system for an NFC juice plant.
2020 Mexico, design, engineering, delivery and commissioning of a complete process system for a turn-key aseptic tank farm for NFC orange and lime juice.
2019 Brasil/China, engineering and design for the de-commissioning and reinstallation of a cargo system for both NFC and FCOJ, from three into two new juice vessels.
2018 China, conversion management of a cargo vessel into a juice vessel, including coordination, project management, process, automation and electrical engineering, supervision and commissioning on site.
2018 The Netherlands, design, construction, turn-key installation and commissioning of the process system of an NFC juice storage facility.
2017 The Netherlands, design, construction, turn-key installation and commissioning of the process system of a liquid ferry for shortsea transport of juice and dairy products.
2016 Belgium, removal and re-installation of cargo tank system from an existing vessel into a new juice vessel.
2015 Egypt, consultancy, commissioning, and technical assistance for starting up a juice production plant and storage facility.
2015 Juice vessel, replacement of NFC piping-, supply new nitrogen system and several modifications.
2014 Juice vessel, engineering, design, construction and turn-key installation of new NFC piping, CIP system and nitrogen system
2014 Juice vessel, engineering, design, construction and turnkey installation of a new air compressor system and deckhouse modification.
2013 Expansion of cargo capacity on a juice vessel by means of extra tank containers, including engineering, design, construction, turnkey installation and commissioning of the process and electrical system
2012 Germany, on board of a juice vessel, engineering, design, construction and installation of 5 additional cargo tanks for both NFC and FCOJ.
2011 Belgium, juice terminal expansion with special product handling system and new refrigeration plant based (due to facing out of Freon R22) modular based ammonia system with secondary cooling fluid.
2010 Belgium, expansion of the NFC terminal with several process lines, including engineering, installation and automation.
2009 Juice vessel, engineering, design, construction and installation of cargo tanks for both NFC and FCOJ, at our own construction site in Brazil.
2008 Juice vessel, engineering, design, construction and installation of 6 cargo tanks, including tank and process engineering, purchasing.
Followed by cargo and cooling system maintenance by Trilobes Maintenance.
2008 Juice vessel, engineering and installation of an additional NFC process system making it an aseptic juice vessel, during her stay at a yard in Singapore.
2007 Belgium, reconstruction of ship cargo system, new cooling plant and updating automation.
2007 Brazil, study juice supply chain regarding vessels, storage and production capacity. This as a blue print for later executed projects.
2006 Australia, expansion of juice terminal with drum filling equipment.
2006 Brasil, re-installation of large sized cargo modules between two vessels.
2006 China, study apple juice concentrate supply chain.
2005 Antwerp, expansion of juice terminal with process equipment